FACTORY INTRODUCTION
FACTORY INTRODUCTION
FACTORY INTRODUCTION
- AMC steel structure factory was built on an area of 3.5 hectares in Giai Pham Commune, Yen My District, Hung Yen province. The system of modern machinery and equipment, advanced technology, highly automated equipment operates under a closed production process. AMC has the ability to meet a variety of pre-engineered steel frame structures of all apertures, a variety of structure and material options to suit the terrain and purpose of construction.
- Structural output capacity of 24,000 tons/year, supply and construction of roofing and covering products equivalent to 1,000,000 m2/year.
- Production process according to quality management standard ISO 9001:2015, with modern automatic and semi-automatic machinery lines, applying science and technology to production with a team of technicians and employees have a high level. Products are rigorously tested according to industry standards set forth at each stage from consulting, design, raw material preparation, production to completion before being transferred to the assembly site, to ensure quality. the best products offered to customers.